Journal
Materials
9 min read
Designing for 6 °C cooler
Vaults, shade and moving air: the passive cooling strategy behind the Marvila cloister, with the numbers.


Written by
Rafael Antunes
Partner, Technical Director
Vaults, shade and moving air: the passive cooling strategy behind the Marvila cloister, with the numbers.
Start with how people move
Most briefs arrive as a list of rooms and areas. We translate them into movements instead: arriving, waiting, climbing, gathering, leaving. A building that gets these right feels generous even when it is small.
On every project we walk the site at three times of day and film it at eye level. The footage is unglamorous, but it shows where shade falls, where people cut corners and which views make them slow down.
Test it in card, then in conversation
A 1:200 card model costs an afternoon and saves months. We put it on the table with clients, engineers and neighbours and ask the same question each time: where would you stop?
“The best plans are the ones people can read with their feet.”
What we take forward
Each project leaves us with a few rules worth keeping. Widen the stair where people meet. Put the best window at the end of the corridor. Never let the lift be the most comfortable way up.
(More) Journal


